March 19, 2010
Agenda
Minutes
Action Sheet
Recap: Commission approves Salvation Army Camp expansion in Ramona, church construction in Sweetwater and cellular sites in Valley Center and Boulevard.
Final Environmental Impact Report for Salvation Army; 3301 70-379-03
TITLE PAGE
TABLE OF CONTENTS
RESPONSE TO COMMENTS
I.0 FINAL EIR INTRODUCTION
S.0 SUMMARY
1.0 PROJECT DESCRIPTION AND ENVIRONMENTAL SETTING
2.0 SIGNIFICANT ENVIRONMENTAL EFFECTS
2.1 Geology/Soils
2.2 Biological Resources
2.3 Hazards and Hazardous Materials
2.4 Noise
2.5 Aesthetics
2.6 Cultural Resources
2.7 Land Use/Planning
3.0 CUMULATIVE IMPACTS
4.0 PROJECT ALTERNATIVES PART 1
PROJECT ALTERNATIVES PART 2
5.0 LONG-TERM ENVIRONMENTAL EFFECTS
6.0 ENVIRONMENTAL EFFECTS FOUND NOT TO BE SIGNIFICANT
7.0 LIST OF REFERENCES
8.0 LIST OF EIR PREPARERS AND PERSONS AND ORGANIZATIONS CONTACTED
9.0 LIST OF MITIGATION MEASURES AND ENVIRONMENTAL DESIGN CONSIDERATIONS
APPENDICES
Appendix A: NOP & Responses
Appendix B: Biological Report Part 1
Biological Report Part 2
Biological Report Part 3
Appendix C: Noise Study
Appendix D: Cultural Resources
D1- Cultural Resources Significance Evaluation of the Salvation Army Sierra
Del Mar Divisional Camp
D2- Cultural Resources Survey for the Salvation Army's Proposed Water Tank
and Campground Installation
D3- Results of the Sierra Del Mar Salvation Army Survey
Appendix E: Traffic Report
Traffic Report Clean Copy
Traffic Report Strikeout Version
Appendix F: California Register of Historic Resources
Appendix G: Stormwater Analysis
Appendix H: Public Service Letters
Appendix I: Fire Protection Plan
Exhibit E of the Fire Protection Plan
RMWD Acceptance Letter
Appendix J: Water Systems Evaluation
Appendix K: Wastewater Disposal Systems Design
Drainage Study
Exhibit 1
Exhibit 2
Exhibit 7
Exhibit 11